Delivering Reliable Energy to APS Murree Road
Army Public School (APS), located on the bustling Murree Road in Rawalpindi, serves hundreds of students daily, requiring consistent electricity to power classrooms, administrative functions, and essential technology. With frequent power interruptions affecting the smooth functioning of the institution, APS sought a sustainable energy solution.
Terranova Energy stepped in to resolve the issue, installing a 30 kW on-grid solar power system.
This solution offered APS cost-effective, uninterrupted electricity, ensuring that the school could focus on delivering quality education without the concern of power outages.
Step-Wise Process of Solar Installation
Our methodical approach guaranteed a well-executed, seamless solar installation for the school.
1
Initial Site Survey
Conducted an in-depth survey of APS to understand energy needs and assess rooftop space for solar panels.
2
Custom System Design
Engineered a 30 kW solar solution tailored to the school's daily energy consumption and future needs.
3
Selection of Premium Equipment
We chose high-efficiency panels and inverters suitable for local climate and energy optimization.
4
Professional Installation
Installed the solar system with minimal disruption to school operations, ensuring a safe environment.
5
System Testing & Monitoring
Our team performed rigorous testing and set up real-time monitoring to ensure the system’s peak performance.
6
Post-Installation Support
Provided ongoing support and regular check-ins to monitor the system’s functionality and energy output.
Project Information
Project Name:
APS Murree Road Solar Installation
Project Size:
30 kW