Quick & Seamless 115 kW System Installation
The Frontier Works Organization (FWO), established in 1966, is Pakistan’s premier engineering and construction firm, renowned for projects like the Karakoram Highway.
Facing rising energy costs and a commitment to sustainable operations, FWO sought an efficient energy solution. Oslo Power provided a 115 kW solar system, enabling FWO to save approximately PKR 200 million over 25 years.
Our Implementation Process
Oslo Power executed a comprehensive solar installation, ensuring seamless integration with FWO’s infrastructure.
1
Site Assessment
Conducted a thorough evaluation of FWO's facilities to determine optimal solar panel placement.
2
Customized System Design
Developed a tailored 115 kW solar solution to meet FWO's specific energy requirements.
3
Procurement of Quality Materials
Sourced high-efficiency solar panels and inverters to ensure maximum energy output.
4
Professional Installation
Deployed experienced technicians to install the system with minimal disruption to FWO's operations.
5
System Integration
Integrated the solar setup with existing electrical systems for seamless energy transition.
6
Testing and Commissioning
Performed rigorous testing to ensure optimal performance and safety standards.
Project Information
Project Name:
115 kW Solar System - FWO Rawalpindi
Timeline:
May 24, 2024 - June 14, 2024
Location: